Close Menu
OsunDailyNG
  • NATIONAL
  • LATEST
  • POLITICS
  • OSUN NEWS
  • METRO
  • ENTERTAINMENT
  • SPORT
  • BUSINESS
  • WORLD
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
OsunDailyNGOsunDailyNG
Subscribe
  • NATIONAL
  • LATEST
  • POLITICS
  • OSUN NEWS
  • METRO
  • ENTERTAINMENT
  • SPORT
  • BUSINESS
  • WORLD
OsunDailyNG
Home » FG mulls plan to import €1.2m equipment for Eko Bridge rehabilitation
LATEST

FG mulls plan to import €1.2m equipment for Eko Bridge rehabilitation

OsunDailyBy OsunDailyOctober 30, 2023No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
FG to shut Third Mainland Bridge for repairs
Share
Facebook Twitter LinkedIn Pinterest Email
Reach the right people at the right time with OsunDailyNG. Try and advertise any kind of your business to users online today. Kindly contact us for your advert or publication at newsdesk@osundailyng.com Call or Whatsapp: +2348132512456 07056907162

The Minister of Works, Dave Umahi, says the government needs to import construction equipment worth €1.2 million to carry out rehabilitation works on the Eko Bridge in Lagos State.

The Minister announced during a working visit to Third Mainland, Carter, Falomo, Iddo, Eko, Marina and Iganmu bridges in Lagos State, alongside some directors and contractors.

In a statement by the Deputy Director of Press and Public Relations, Clement Ezeorah, on Sunday, the Minister said the deck on Eko Bridge would be opened for proper repair, hence the need to import the equipment.

Umahi said, “Due to the technicality of the job on Eko Bridge, where the bridge deck would be open, equipment worth €1.2m would be imported into the country that would be used in maintaining the aspect of the bridge.”

According to the Minister, lack of maintenance culture from the national level was the root cause of the deflection on the bridge, while also pointing out problems on the Third Mainland Bridge, which was built in two sections 60 years ago.

“Eko Bridge suffers two problems – the lack of maintenance and the eating up of the bearings. There are lots of air gaps, but the last administration did very well and did wonderful work.

“Work is ongoing; it will be completed in 2024 because we are pushing for an increase in the number of workers and equipment on the site.

“Without Eko Bridge, we will not have any trucks coming into Lagos Island”, he said.


Reach the right people at the right time with OsunDailyNG. Try and advertise any kind of your business to users online today. Kindly contact us for your advert or publication at newsdesk@osundailyng.com Call or Whatsapp: +2348132512456 07056907162
1.2m Bridge Eko equipment Import mulls Plan rehabilitation
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
OsunDaily
  • Website

Related Posts

Anti-Matawalle protests sponsored by Zamfara Govt – APC group

May 10, 2025

Gunmen kill three security personnel during attack on anti-banditry office in Jigawa

March 6, 2025

Troops rescue abducted lecturer in Plateau

March 4, 2025

Comments are closed.

Facebook X (Twitter) Instagram WhatsApp Telegram Threads
  • Home
  • Privacy Policy
  • Advertise with US
  • Contact Us
  • About Us
© 2025 OsunDailyNG Media Hub. Designed by OsunDailyNG Media Hub.

Type above and press Enter to search. Press Esc to cancel.

Join Osun DailyNG Media Hub

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.